Construction Update

Click on image to enlarge

August 2025

August 10th
  –  
Everhome Markham Community Updates
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
August 7th
  –  
NORTH BLOCK: North Block lobby is shown along with suites east of the lobby.
Everhome Markham Construction

July 2025

July 31st Updates
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
July 29th
  –  
Exterior West Elevation
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
July 17th
  –  
EAST BLOCK: West side exterior waterproofing and cladding progressing well.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
July 4th
  –  
The angular archway entrance to the North block completed and ready to receive Prada Lime Green aluminium metal plate.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

May 2025

May 27th
  –  
NORTH and SOUTH Blocks: Demising Wall steel stud framing in place for level 2.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

April 2025

April 17th
  –  
NORTH Block: Roof Pour Underway.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
April 14th
  –  
All Windows on East Block Now Completed.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
April 8th
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
April 4th
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
April 1st
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

March 2025

March 21st
  –  
NORTH Block: 5th level slab pour completed.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction
March 19th
  –  
EAST Block: Waterproofing of the Penthouse Level Terraces almost complete.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

February 2025

February 21st
  –  
EAST Block : Generator placed in its final position on the roof. Mechanical penthouse room, steel stud and sheathing well underway.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

January 2025

January 20th
  –  
EAST Block built form facing east onto McCowan Rd.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

December 2024

December 18th
  –  
EAST Block formwork completed to the roof of the mechanical penthouse to the east side and the rooftop terraces of the west side two-storey units. Windows installation completed to Level 7.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

November 2024

November 5th
  –  
Window installation for Levels 2 and 3 completed
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

October 2024

October 24th
  –  
Decking for the Roof of the 2-Storey Penthouse Suites facing West well underway. Elevator and south stair well already erected to the Mechanical Penthouse Level.
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

September 2024

September 13th
  –  
EAST Block : Level 8 pour 1, completed, view looking East
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

August 2024

August 29th
  –  
Decking South Block Level 2
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

May 2024

May 31st
  –  
EAST BLOCK : 40% Level 3 Slab Completed
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

March 2024

March 22nd
  –  
N101 and N102 top concrete pour completed
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

December 2023

December 11th
  –  
Conduit work and top bar placement continues along the south side of the Central Courtyard in preparation for the next pour
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

October 2023

October 27th
  –  
Decking on the West side continues for the ground floor slab
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

September 2023

September 26th
  –  
Structural slab along the north side, mid-span formed, next to the ramp on the south section
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

July 2023

July 26th
  –  
Completed Slab On Grade (SOG) between the North perimeter wall and the Geo-thermal Room
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

June 2023

June 28th
  –  
The final geo-thermal loop (B) being grouted and cleared for fusing to begin
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

April 2023

April 20th
  –  
Formwork for P2 Structural Slab underway
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

February 2023

February 28th
  –  
East end of geo-thermal room completed
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

January 2023

January 23rd
  –  
Geo-thermal room perimeter on P3 is complete
Everhome Markham Construction
Everhome Markham Construction
Everhome Markham Construction

December 2022

December 7th
  –  
P3 Termination Wall Connected to Geo-thermal Room Wall
Everhome Markham Construction
Everhome Markham Construction

November 2022

November 24th
  –  
Preparing Forms for the Geo-thermal Room
Everhome Markham Construction
Everhome Markham Construction

October 2022

October 19th
  –  
CRANE BASE COMPLETE
Everhome Markham Construction
Everhome Markham Construction

August 2022

August 18th
  –  
Excavation Reinitiated to Reach the Final Geodetic Depth.
Everhome Markham Construction
Everhome Markham Construction

July 2022

July 15th
  –  
Excavation and lagging work continues...
Everhome Markham Construction
Everhome Markham Construction

June 2022

June 10th
  –  
86 Shoring Piles Complete.
Everhome Markham Construction
Everhome Markham Construction

May 2022

May 5th
  –  
Fourteen piles completed to date on the north side.
Everhome Markham Construction
Everhome Markham Construction

April 2022 – Official Start of Construction

April 23th
  –  
Completing the platform for shoring to begin.
Everhome Markham Construction
Everhome Markham Construction

February 2022

February 24th
  –  
Bore hole drilling continues.
Everhome Markham Construction
Everhome Markham Construction

January 2022

January 2022
Everhome Markham Construction
Everhome Markham Construction

October 2021

October 2021
Everhome Markham Construction
Everhome Markham Construction

July 2021

July 2021
Everhome Markham Construction

June 2021

June 2021
Everhome Markham Construction
Everhome Markham Construction
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Excavation and lagging work continues...
X
Excavation and lagging work continues...
X
Excavation Reinitiated to Reach the Final Geodetic Depth.
X
Excavation Reinitiated to Reach the Final Geodetic Depth.
X
CRANE BASE COMPLETE
X
CRANE BASE COMPLETE
X
Additional Vertical Forms Prepped on P3
X
View looking east showing progress of footings and verticals
X
Waterproofing Started on the East Side
X
Wall Forms Erected on the South Side
X
Geo-thermal room perimeter on P3 is complete
X
Rebar for P2 verticals have been assembled
X
Forming of the sump pit for the east block has started
X
East end of geo-thermal room completed
X
Remaining lagging work on northeast side now continues
X
Waterproofing on P3 to P2 Demising wall complete
X
Formwork for P2 Structural Slab underway
X
Geo-thermal circuit D loop is being laid on P2 trenches
X
Formwork for P2 capitals on columns underway
X
The final geo-thermal loop (B) being grouted and cleared for fusing to begin
X
Perimeter wall forms in place for the Northside of the site at the retaining wall, P1 to ground
X
Rebar placement around the east stairwell for the North Block started, Level 2 to 1. Trenching for the geo-thermal loops in the foreground
X
Completed Slab On Grade (SOG) between the North perimeter wall and the Geo-thermal Room
X
Preparation to initiate shotcrete along the North perimeter wall, towards the East perimeter wall
X
Completed Slab On Grade (SOG) around the crane base
X
September 26th - Structural slab along the north side, mid-span formed, next to the ramp on the south section
X
September 26th - Bottom rebar placement continues and conduit work started along the Northeast side for ground floor slab
X
September 26th - Forms are being placed around the EAST BLOCK elevators
X
October 27th - Decking on the West side continues for the ground floor slab
X
October 27th - Waterproofing, and rebar placement completed on the North side, in preparation for Shotcrete to follow
X
October 27th - Air shaft at the Northeast corner formed for the south and west walls
X
December 11th - Conduit work and top bar placement continues along the south side of the Central Courtyard in preparation for the next pour
X
December 11th - Completed the second concrete pour for the terraces related to the SOUTH Block
X
December 11th - Bottom rebar placement on the last portion of the east side of the SOUTH Block underway
X
March 22nd - Bottom pour associated with the NORTH Block, entrance of N101 and N02 completed. Forms erected for the top concrete pour
X
March 22nd - Forms stripped to expose columns from Ground to Level 2 on the EAST Block
X
May 31 - EAST BLOCK : 40% Level 3 Slab Completed
X
May 31 - EAST BLOCK : 40% Level 3 Slab Completed
X
May 31 - EAST BLOCK : 40% Level 3 Slab Completed
X
August 29 - Decking South Block Level 2
X
August 29 - Level 3 Densglass perimeter wall facing West
X
August 29 - Stud work Level 4 started
X
September 13 - EAST Block : Level 8 pour 1, completed, view looking East
X
September 13 - NORTH Block : Stair on the east side, prepped to receive concrete pour extending to the second level
X
September 13 - Sanitary connections below grade well underway for the SOUTH Block
X
October 24 - Decking for the Roof of the 2-Storey Penthouse Suites facing West well underway. Elevator and south stair well already erected to the Mechanical Penthouse Level.
X
October 24 - SOUTH BLOCK: 3rd level pour completed
X
October 24 - EAST BLOCK: Dens glass placement on the exterior face and Blue skin application complete along the entire rough window opening. Window track placement on the base to receive the window installation.
X
November 5 - Window installation for Levels 2 and 3 completed
X
November 5 - Window installation for Levels 2 and 3 completed
X
November 5 - Mechanical penthouse roof prepped for final concrete pour
X
December 18 - EAST Block formwork completed to the roof of the mechanical penthouse to the east side and the rooftop terraces of the west side two-storey units. Windows installation completed to Level 7.
X
December 18 - Aerial View looking west capturing the completion of the EAST Block formwork.
X
December 18 - SOUTH Block - preparation of the 4th level concrete topping slab, with the placement of plywood sheets between joists supported by roll backs, and future placement of steel mesh to sit on top of the plywood.
X
January 20 - EAST Block built form facing east onto McCowan Rd.
X
January 20 - Phase one of the waterproofing completed on the WEST Block Amenity Building. Windows are in place as shown.
X
January 20 - Back-up Generator Pad, with isolation springs on piers in place on the roof of the EAST Block.
X
February 21 - EAST Block : Generator placed in its final position on the roof. Mechanical penthouse room, steel stud and sheathing well underway.
X
February 21 - Hand railing installation in the stairwells started.
X
February 21 - North Block : Installation of windows completed up to level 3 on both sides, courtyard and northern side.
X
March 19 - EAST Block: Waterproofing of the Penthouse Level Terraces almost complete.
X
March 19 - EAST Block: Mechanical Penthouse Room is in the process of completing the steel stud work, which would be followed by placement of exterior sheathing.
X
March 19 - EAST Block: Blue skin application on the mezzanine level of the Penthouse Level 2-storey suites completed.
X
March 21 - NORTH Block: 5th level slab pour completed.
X
March 21 - NORTH Block: 3rd Level cleaned in preparation of the demising wall layouts.
X
March 21 - EAST Block: 8th level window installation completed. Preparation for the mezzanine level windows well underway.
X
April 1st
X
April 1st
X
April 1st
X
April 4th
X
April 4th
X
April 4th
X
April 8th
X
April 8th
X
April 8th
X
April 14 - All Windows on East Block Now Completed.
X
April 14th - South Block Waterproofing Fully Completed.
X
April 14th - Upturn Waterproofing of the South Block is now Completed.
X
April 17 - NORTH Block: Roof Pour Underway.
X
April 17th - Geo-Thermal Work Completed.
X
April 17th - South Block: Roof Pour Completed.
X
May 27th - NORTH and SOUTH Blocks: Demising Wall steel stud framing in place for level 2.
X
May 27th - NORTH and SOUTH Blocks: Corridor and Demising Wall steel stud erection completed on Level 3.
X
May 27th - WEST Block: Perimeter Insulation and poly completed for all 3 levels of the Amenity Pavilion. Ready for City of Markham Inspection prior to Boarding.
X
July 4th - The angular archway entrance to the North block completed and ready to receive Prada Lime Green aluminium metal plate.
X
July 4th - Final crane opening within the courtyard ready for concrete.
X
July 4th - West block exterior envelope completed. The North block is shown in the foreground.
X
July 17th - EAST BLOCK: West side exterior waterproofing and cladding progressing well.
X
July 17th - EAST BLOCK: Detailing of the inset Balcony Walls progressing well. Image shown is facing west towards the future Central green courtyard.
X
July 17th - SOUTH BLOCK: Waterproofing and exterior cladding now wrapping around the east side.
X
July 29th - Exterior West Elevation
X
July 29th - Exterior South Elevation
X
July 29th - Exterior East Elevation
X
July 31st - Main level lobby curtain wall being erected.
X
July 31st - Wood feature on East Block balconies almost complete.
X
July 31st - East Block underside of level 2 drain connections completed.
X
July 31st - South Block waterproofing on penthouse level started.
X
July 31st - Green roof, the final portion of the Roof Assembly about to start.
X
July 31st - Balcony railing installation has started.
X
August 7th - NORTH BLOCK: North Block lobby is shown along with suites east of the lobby.
X
August 10th - Current form of the East Block.
X
August 10th - Close-up of the South Block revealing woodgrain cladding on the East side.
X
August 10th - View from the central courtyard facing East.
X
August 10th - Current form of the North Block.
X
August 10th - Current form of the South Block.
X
August 10th - Wood feature and railing installation completed on East Block balconies.
X