Construction Update
Click on images below
January 2025
January 20th – EAST Block built form facing east onto McCowan Rd.



December 2024
December 26th – Everhome EAST Block Areal Update
December 18th – EAST Block formwork completed to the roof of the mechanical penthouse to the east side and the rooftop terraces of the west side two-storey units. Windows installation completed to Level 7.



November 2024
November 5th – Window installation for Levels 2 and 3 completed



October 2024
October 24th – Decking for the Roof of the 2-Storey Penthouse Suites facing West well underway. Elevator and south stair well already erected to the Mechanical Penthouse Level.



October 17th – Everhome Drone Update
September 2024
September 13th – EAST Block : Level 8 pour 1, completed, view looking East



September 6th – AERIAL VIEW :: Looking northwest to capture the progress of the NORTH Block with the structural steel placement



August 2024
August 29th – Decking South Block Level 2



August 27th – East Block Decking for Level 7 Complete
July 2024
July 23rd – East Block Decking for Level 6 Complete
July 10th – Construction progress video
July 2nd – Construction progress video
June 2024
June 18th – Rebar and sleeving progresses well for the balance of the north side of Level 4 Slab



June 17th – Elevator lift completed on the second level of the West Block



June 15th – 65% of Level 4 Slab completed. Bottom rebar placement along with sleeving and conduit work continues for the balance of Level 4



June 7th – West Block second level wall panels completed allowing the Hambro Joists for the ceiling to be erected



June 4th – EAST BLOCK : Lower rebar placed on the balance of formwork for Level 3, from the pour break to the northern edge. Conduit and sleeve work also started.



May 2024
May 31st – EAST BLOCK : 40% Level 3 Slab Completed



May 30st – Next Step wall panel erection for the the Kids Play Area and Movie Screening Room on level 2



March 2024
March 22nd – N101 and N102 top concrete pour completed



March 18th – EAST Block, level 2 decking started and progressing well from the south side heading north. Square columns from ground to level 2 formed and stripped



March 8th – Decking for units N101 and N02 on the elevated portion of the NORTH Block has been completed. Rebar placement has started and continues.



March 6th – Scaffolding to the second level of the EAST Block started



January 2024
January 30th – Portion of the ground floor slab completed on the EAST Block



December 2023
December 11th – Conduit work and top bar placement continues along the south side of the Central Courtyard in preparation for the next pour



December 8th – First pour of the South Block ground floor section is complete



December 6th – Rebar and Stud Rail placement continues on the Southwest side of Everhome



November 2023
November 20th – Slab for the Southwest corner has been completed



October 2023
October 27th – Decking on the West side continues for the ground floor slab



October 25th – Decking work continues on the Ground Floor around the crane base



October 2nd – Stripping of the Stairwell and EAST Block Elevators completed



September 2023
September 26th – Structural slab along the north side, mid-span formed, next to the ramp on the south section



September 22nd – Rebar placement continues to the garage door entry below the North Block



September 18th – Decking, rebar and conduit placement continues along the Northeast side of the site



September 8th – P1 structural slab poured from N6 to N9 (west to east), along the North Perimeter Wall, south to the Geo-Thermal wall



September 6th – Aerial view capturing site progress at Everhome Markham


September 5th – Rebar and conduit work continues on the structural slab next to the North Perimeter Wall



September 1st – North Perimeter Wall stripped and moved east for the next section



August 2023
August 30th – Central section form work started, P1 to Ground



August 29th – P1 decking continues along the northern side of the property from West to East



August 28th – P1 Structural Slab poured that will act as base for the soil in the Central Courtyard



August 4th – All SOG (Slab On Grade) now complete!



August 2nd – Prepping for Concrete Pour at P1 around the crane base



July 2023
July 26th – Completed Slab On Grade (SOG) between the North perimeter wall and the Geo-thermal Room



July 18th – Additional 3/4” stone received for spreading in preparation of Slab On Grade (SOG) around the crane base



July 13th – Conduit and rebar for the west side completed, awaiting concrete



July 11th – Final geo-thermal loop complete and pressure tested. Trenches with the main loop pipes are being back filled with 3/4 stone



June 2023
June 28th – The final geo-thermal loop (B) being grouted and cleared for fusing to begin



June 19th – Erecting column forms from P1 to Ground on the South East side.



June 14th – Perimeter wall forms have arrived to site



April 2023
April 20th – Formwork for P2 Structural Slab underway



April 14th – Pour 2 on P3 completed



April 13th – Slab On Grade (SOG) P3 Pour 1 completed



April 4th – 3/4" stone now being distributed on P3 in advance of Slab-On-Grade
March 2023
March 29th – Final preparation for Slab on Grade
February 2023
February 28th – East end of geo-thermal room completed
January 2023
January 23rd – Geo-thermal room perimeter on P3 is complete
December 2022
December 7th – P3 Termination Wall Connected to Geo-thermal Room Wall
November 2022
November 24th – Preparing Forms for the Geo-thermal Room
October 2022
October 19th – CRANE BASE COMPLETE
September 2022
September 16th – Second Row of Cross Braces Installed on the Northwest Corner.
August 2022
August 18th – Excavation Reinitiated to Reach the Final Geodetic Depth.
July 2022
July 15th – Excavation and lagging work continues...
June 2022
June 10th – 86 Shoring Piles Complete.
May 2022
May 5th – Fourteen piles completed to date on the north side.
April 2022 – Official Start of Construction
April 23th – Completing the platform for shoring to begin.
March 2022
March 21st – Geo-thermal drilling has been completed.
February 2022
February 24th – Bore hole drilling continues.
January 2022
January 2022
October 2021
October 2021
July 2021
July 2021
June 2021
June 2021